Is there equipment available? How long is the production and supply?

We try to keep the basic position of our products in stock.

If the equipment is not available, the manufacturing and delivery times depend on the season and the production workload.

Average delivery time the main types of concrete mixing equipment ZZBO:

  • mixers 5 ... .10 days.
  • Dosing systems: 5 ... 20 days
  • water dispensers, chemical. additives, cement: 5 ... 20 days
  • silos, screw conveyors, control panels: 5 ... 20 days
  • concrete plants: 10 ... ..30 days.

Actual delivery times mixing technology specify at managers по телефону 8-800-200-4430.