Concrete plant LENTA-120
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
40 651 965 ₸
- Twin-shaft concrete mixer BP-2G-3000
- Планетарные мотор-редуктора "LIKEDRIVE" M310R, мощность привода 37 кВт - 2 шт
- Pneumatic valve double
- Connection set for pneumatic equipment
- The number of shafts 2, the number of spokes 2 x 8
- The blades are replaceable 16 pieces. Material: Cast iron CHH16N2T (highly doped chromium wear-resistant)
- Changeable armor flake type. Material: Cast iron ЧХ16Н2
- Automatic central lubrication system
- Secure access system
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Concrete mixer machinery certificate
10 776 863 ₸
- Belt conveyor 17 meters, belt width 1000 mm, assembled
- Drive gear motor 18,5 kW
- Receiving hopper
- Mounting frame. 25 degrees inclination
- Leading drum with lining. ⌀ 420 mm, width 1100 mm
- Driven drum. ⌀ 400 mm, width 1100 mm
- Chevron belt, thickness - 6 mm
- Docking lock “BARGER” (Russia)
- The roller support is grooved (paint and varnish coating). ⌀ 89mm
- Supporting rollers. ⌀ 89 mm
- Guide rollers. ⌀ 60mm
- Passport and instruction manual for the conveyor
6 249 964 ₸
- Overpass E 144. The design enhanced, adapted for the discharge of concrete on the height of 4000 mm
- mixer platform with supporting structures
- Ladders for equipment maintenance
- Fence along the perimeter
- Staircase with handrails
- Funnel for unloading concrete with rubber guide
- Fastening construction for pipes and electric cables
- Hardware for the assembly trestle
- Coating: shotblasting, double coloration with drying chamber
- Total weight - 2500 kg
7 136 667 ₸
- Support frame (powder coated). Weight 450 kg
- Cement dispenser with 1,200 kg dosage (powder coated):
- Three inlet pipes for augers (Two are covered with lids)
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc pneumatic valve ∅300
- Strain gauges - 3 pcs.
- Signal amplifier - weight sensor
- Pneumatic distributors - 4 pcs.
- Vibrator MVE 300/3 - 1 pc.
- Dispenser 550 liters of water (powder coating):
- Strain gauges - 3 pcs.
- Unloading disc pneumatic valve ∅80
- Water dump pump
- Signal amplifier - weight sensor
- Dispenser chemical additive 80 liters stainless steel:
- Strain gauges - 2 pcs.
- Signal amplifier - weight sensor
23 324 698 ₸
- Aggregate bins (3 x 20). Total volume 60 m³
- Preparation under registers installation for heating inert materials
- Sector valves, with control of pneumatic cylinders - 6 pcs.
- Pneumatic equipment - 6 electro-pneumatic distributors, a set of fittings and tubes, 6 quick exhaust valves, 1 pneumatic regulator, a filter with a pressure gauge
- Vibrator MVE3003 - 6 pcs.
- The support frame, installation without foundation
- Dispenser inert CI-9 (conveyor) with the lined drive drum. Drive power 18,5 kW
- Rollers with anti-corrosion coating
- Load cells for 2 tons - 4 pcs.
- CAS connecting box
- Signal amplifier - weight sensor
- Passport to complex metering and purchased products
- Software on your own SCADA system complete with a monoblock: accounting for the consumption of materials and equipment operation, remote access and control over the work in the local network
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Сontrol panel case protection - IP54
- Power cabinet case protection - IP54
- Control, protective and switching equipment "Omron", "Siemens"
- Set of diagrams and instruction manual
1 265 908 ₸
- Compressor SB4/F-500.LT100 assy
3 751 440 ₸
- Hardware for assembly RBU: metering complex overpass screw silage
- Hardware, accessories
- Wire for screw fixing
- Kit for connecting the database (pnevmotruba, sleeves, bends, RVC 51-70 clamps, duct PVC-5-C-60)
- Limit switch for the database
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints, anchor bolts, brackets)
- Kit RBU pneumatic (air tubing, pnevmotruba, fittings, hardware)
- Set of cables
- Couplings (5 titles)
- compactor
- Acid sealant TempPlus
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
30 044 810 ₸
- Twin-shaft concrete mixer MAO 3000
- Multi-channel uniform water spray system
- Replaceable wear-resistant Ni-Hard cast iron armor, strength 500 HB
- The hydraulic shutter drive system
- Kit for connecting pneumatic equipment (cleaning sealing units)
30 306 274 ₸
- Bunkers of inert BI-80 (4 x 20) - 8 sections. The total volume is 80 cubic meters. meters
- Preparation under registers installation for heating inert materials
- Pneumatic equipment - 8 electric pneumatic distributors, a set of fittings and tubes, 8 quick exhaust valves, 1 pneumatic regulator, a filter with a pressure gauge
- Vibrator MVE 300/3 - 8 pcs.
- Dispenser inert CI-12 (conveyor) with the lined drive drum. Drive power 18,5 kW
- Rollers with anti-corrosion coating
- Strain gauges - 6 pcs.
- CAS connecting box
- Signal amplifier - weight sensor
- Passport to complex metering and purchased products
153 468 ₸
- Conveyor cover 1000 mm wide
3 065 300 ₸
- Operator's cabin. Sheathed by zinc-coated painted profiled sheeting, finishing accessories, moisture protecting impregnation
- Frame protected against corrosion, 60 mm thick heat insulation
- Sound insulation, protection against rain
- Two viewing windows (PVC, double glazed windows), insulated door with lock
- Lighting
- Air conditioning
- Operator table
- Operator's chair
- Heater 2kW
- Slinging loops
- Weight 1000 kg
- Cement filter AIRFILL25 assembly (Turkey) in a rigid package
- Cartridges pneumatic cleaning system
- Adjusting ring
- Operational documentation
53 450 708 ₸
- Metal structures of the insulation frame.
- Ограждающие конструкции - панели типа "сэндвич"
- Viewing windows (PVC, single-chamber double-glazed window) - 5 pieces
- Insulated door - 1 piece
- Additional elements
- Autonomous air-water heating system for the interior space of the plant
- Kit for assembling structures (hardware, foam, sealant, etc.)
- Internal wiring is: a cable gasket in a metal perforated tray and a metal hose, introductory dispenser VRU
- Lighting of the first floor and the mixer service area, switches, sockets
- Packaging
4 391 296 ₸
- Covers the bunkers inert materials (warmed) - 3 pieces
- lifting mechanism lowering the lid with the security system of the broken rope - 3 pieces
- The drive gear motor. 1,5 kW - 3 pieces
- drive rack opening - 3 pieces
- The stationary control panel covers the bunkers
1 653 232 ₸
- Universal double row registers heating inert materials hoppers - 3 sets
- coolant type steam (hot air under pressure)
- The thermal load of up to 180 degrees
- Airfill v25 cement filter with a vibration cleaning (Türkiye)
- Adjusting ring
- Operational documentation
12 392 450 ₸
- Silo can (V=103m³): lid - 4 sectors, cylindrical section - 28 sectors, large cone - 4 sectors, small cone
- Mounting frame
- Stairs
- Cover protection enclosure - 11 sectors
- Loading pipe d 102 with connection lock
- Inspection hatch (Viewing window for inspection and cleaning of the cone)
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Frame for transportation
- Hardware for the assembly of a silo
- Polyurethane sealant Soudaflex FC 40 gray 600 ml - 15 tubes
- Machinery certificate
3 386 852 ₸
- Auger assembly
- Pipe Diameter 273 mm, tube length of 12 000 mm
- Drive: gear motor. Power 15 kW
- Inspection window for cleaning and maintenance
- Operational documentation
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
142 912 ₸
- Emergency pressure relief valve PV273 assy
- Adjusting ring
- Operational documentation
75 516 ₸
- Cement level sensor G2 1/2 220V assy in a package
- Adjusting ring
- Operational documentation
125 048 ₸
- Butterfly valve DN300
- Handle for gate control
- Operational documentation
92 568 ₸
- Vibrator MVE 300/3 complete in package
- Disturbing force - 321 kg
442 540 ₸
- Pump PSTC 65-125/75 assembled for water supply
- Machinery certificate
CBP operation mode - fully automatic using the one-button principle.
Twin-shaft concrete mixer BP-2G-3000 установлен на эстакаде, на высоте разгрузки готовой смеси 4,2 метра. Бетоносмеситель оборудован специальным усиленным ленточным конвейером для загрузки инертных материалов в бетоносмеситель.
ZZBO is the official dealer of SICOMA concrete mixers in Russia and the CIS!
It is possible to supply a concrete plant with a concrete mixer from the manufacturer SICOMA.
For storage and precise batching of the inert materials Dosing complex DCM-60. Inert materials are loaded and stored in bunkers, the number of bunkers is 3, 20 m³ each, the total volume of bunkers is 60 m³. A dosing belt conveyor is installed under the bunkers, on which components are accurately dosed; the components are supplied from the bunkers by opening gate valves, the gates are controlled by a pneumatic system.
Upon achievement of the required batch of the inert materials, the conveyor is turned on and they are discharged into the belt conveyor's receiving hopper and after that into the mixer.
Protect inert materials from precipitation using Shelter of the strip conveyor!
The cement is stored in a special warehouse - cement silo (not included in the basic package). Silos for cement must be selected the rate of two daily stock performance. For feeding cement from a cement silo dispenser must acquire the correct length screw.
Cement silos, silo piping and augers are always in stock in Zlatoust!
Using a screw, cement is supplied to the BD-120 dispenser unit, which consists of a 1200 kg cement dispenser, 550 liters of water and an 80 liter chemical additive dispenser. Each dispenser is located on three high-precision load cells and a rigid frame, which increases dosing accuracy. The cement dispenser is equipped with a vibrator MVE 300/3 to encourage the removal of cement when it sticks.
All components of the mixture are mixed, after obtaining the necessary homogeneity of the mixture, the pneumatic valve of the concrete mixer is opened and the mixture is supplied to the concrete mixer truck or receiving hopper.
Then the cycle is repeated.
In one cycle, 2 m³ of ready-made concrete or mortar is produced; the cycle lasts about 50 seconds. The installation capacity is 90…120 m³ of ready-made concrete or mortar per hour of operation.
- RBU productivity: 120 m³ per hour
- Double shaft concrete mixer 3 m³ with belt feed
- Software on our own SCADA system complete with a monoblock: accounting of material consumption and equipment operation, remote access and control over the work
- Transportation in 3 eurotrucks to the installation site
- 2 year full warranty
Technical Features
- Productivity, m³ hour 90..120
- Automatic operating mode
- Concrete mixer PD-2G-3000
- Hoppers (number x volume m³) 3 x 20
- Silo capacity (optional), tons 160...960
- Design summer
- Load of inert materials into the concrete mixer belt conveyor
- Installed power, kW 127
- Sector gate, pneumatic control
- Dimensions of the basic configuration:
- Weight, kg 26300
- Height, mm 8971
- Width, mm 3860
- Length, mm 28191

Quality
certificates

Products
in stock

Individual configuration
with prices for each item

Mobile
commissioning
available

Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2026
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call hotline in Kazakhstan
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: 010000, Kazakhstan, Akmola region,
г. Astana, prospekt Akžol, Zdanie 44, of. 32
e-mail: sales@zzbo.kz


Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions



















