LENTA Concrete Plants

Filter:

Showing all 8 results

38 490 816 ₸

including VAT 12%
  • Capacity, cu m per hour 24...36
  • Automatic operating mode
  • BP-2G-750 Concrete mixer
  • Bunkers (number x volume m3) 2 x 8
  • Silo capacity (optional), tons 22...315
  • Design summer
  • Load of inert materials into the concrete mixer belt conveyor

54 733 952 ₸

including VAT 12%
  • Capacity, cu m per hour 35...54
  • Automatic operating mode
  • BP-2G-1200 Concrete mixer
  • Bunkers (number x volume m3) 2 x 20
  • Silo capacity (optional), tons 22...315
  • Pneumatic equipment (Italy) CAMOZZI
  • ABAC Pole Position L20P Compressor (Italy) ABAC

67 739 672 ₸

including VAT 12%
  • Capacity, cu m per hour 50...72
  • Automatic operating mode
  • BP-2G-1500 Concrete mixer
  • Bunkers (number x volume m3) 2 x 20
  • Silo capacity (optional), tons 22...315
  • Pneumatic equipment (Italy)
  • ABAC Pole Position L20P Compressor (Italy) SB4/F-270.LB50-5.5

61 666 696 ₸

including VAT 12%
  • Capacity, cu m per hour 50...75
  • Automatic operating mode
  • Sicoma MSO 1750 double -sized concrete mixer
  • Bunkers (number x volume m3) 2 x 20
  • Silo capacity (optional), tons 22...315
  • Pneumatic equipment (Italy)
  • ABAC Pole Position L20P Compressor (Italy) SB4/F-270.LB50-5.5

70 324 800 ₸

including VAT 12%
  • Capacity, cu m per hour 80...106
  • Automatic operating mode
  • BP-2G-2250 Concrete mixer
  • Bunkers (number x volume m3) 3 x 20
  • Silo capacity (optional), tons 160...315
  • Design summer
  • Load of inert materials into the concrete mixer belt conveyor

87 039 680 ₸

including VAT 12%
  • Productivity, m³ hour 90..120
  • Automatic operating mode
  • Concrete mixer PD-2G-3000
  • Hoppers (number x volume m³) 3 x 20
  • Silo capacity (optional), tons 160...960
  • Design summer
  • Load of inert materials into the concrete mixer belt conveyor

121 200 352 ₸

including VAT 12%
  • Productivity, m³ hour 90...144
  • mode auto
  • Concrete mixer PD-2G-3000 3000 l loading
  • Hoppers (number x volume m³) 4 x 20
  • Silo capacity (optional), tons 160...960
  • Design summer
  • Load of inert materials into the concrete mixer belt conveyor

163 468 759 ₸

140 746 666 ₸

- 14% discount
including VAT 12%
  • Productivity, m³ hour 110...216
  • Режим работы автоматический на ПО "SCADA"
  • 31 095 $ 1
  • Two-shaft concrete mixer BP-2G-4500 4500 liters for loading
  • Hoppers (number x volume m³) 4 x 30
  • Silo capacity (optional), tons 160...2060
  • Load of inert materials into the concrete mixer belt conveyor

Explanation of name LENTA - XX:


  • LENTA - aggregates' feeding into the mixer using belt conveyor
  • XX - concrete plant capacity (in cubic meters per hour of operation)

Concrete factory with tape supply of materials to a concrete mixer

На бетонных заводах производства ЗЗБО двухвальный бетоносмеситель устанавливается не на нулевой отметке производственной поверхности, а на эстакаде, обеспечивающей разгрузку готовой бетонной смеси с высоты 4 метра. Поэтому и инертные материалы из дозирующего комплекса после набора необходимой дозы подаются наверх в смесительную камеру бетоносмесителя по транспортерной ленте наклонного конвейера. Включение конвейера происходит автоматически.


To prevent rash from the surface of the working conveyor of bulk materials, the conveyor tape must have sides. In this regard, on the conveyor of the LK-15 type, which is included in the basic configuration of the concrete factory, the Chevrony (Chevron) conveyor tape is used. It is a tape with rubber protruding ribs located angularly. In conditions when the layout of the concrete production equipment was carried out on the minimum production area, as the ZZBO is achieved, the tapes with a smooth loading surface are unsuitable for transporting materials (for them the upper boundary of the conveyor angle is only 22 degrees). This factor also motivates the need to use a chevar tape. Its other advantages: at the height of the holding profiles from 14 to 32 mm, the angle of inclination of the conveyor is allowed to 40 degrees, as well as the possibility of repeated joint of the edges of the tape methods of hot vulcanization, cold gluing and even ordinary mechanical fixation.


Those who want to buy RBU, the ZZBO is ready to put the full equipment of the RBU equipment, the price of which flexibly takes into account all the design features and the proposed additional options. The RBU production with Skipova and with a strip supply of inert materials to the concrete mixer has been debugged. The option of feeding materials is reflected in the designation of the nomenclature of the ZZBO products: for the supply of materials with a skip - letter from “Bulgaria", for a tape (conveyor) delivery method - letter L. That is, when the sale of the RBU is sold, the designation of which Rbu-2g-36, here is a concrete plant with a capacity of 36 cubic meters of concrete per hour with a ribbon supply of materials.


The cost of the RBU with a strip supply of materials is almost the same with the cost of the RBU with a skip. Therefore, to adjust the customer his business plan for the RBU after choosing the method of submitting inert materials will have to be slightly.