COMPACT-90 Concrete Plant
67 709 376 ₸




Enquire conditions
and delivery time

We'll call you back within 15 minutes

Specify your requirements

Send prices and terms of delivery
29 539 104 ₸
- Twin-shaft concrete mixer for 2250 liters
- Frame for skip hoist installation
- Skip displacement of 2.5 cc. m
- The winch drive - 22 kW with electro-brake
- Pneumolock double
- Connection set for pneumatic equipment
- Armor shift flake type. Material: cast iron wear 16 mm
- Спицы усиленные (стальное литье) крепление типа "кулак"
- Changeable blades. Material: ЧХ16Н2Т cast iron (chromic high alloy wear-resistant)
- Automatic central lubrication system
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Concrete mixer machinery certificate
- Mounting frame, mobile. Installation without foundation
- Бункеры инертных материалов (3х18 м³)
- Preparation under registers installation for heating inert materials
- Pneumatic valves - 6 pieces
- Pneumatic dampers - 6 pieces
- Filter regulator - 1 piece
- Vibrators MVE 3003 - 6 pieces
- Inert materials belt conveyor (dosage - 0-2500 kg). Belt speed - 1.6 m/sec
- 11 kW lined motorized conveyor drum with smooth-start system (when purchased with control panel)
- Drum tension station
- Load cells SBA-2T 2 tons - 4 pieces
- CAS connecting box
- Signal amplifier - weight sensor
4 729 536 ₸
- Mounting frame (powder coating). Weight - 200 kg
- Cement dispenser, dosage - 900 kg (powder coating):
- Three inlet pipes for augers (Two are covered with lids)
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc damper ∅200
- Strain gauges - 3 pcs.
- Signal amplifier - weight converter - 3 pcs.
- Pneumatic distributors - 4 pcs.
- Vibrator MVE41 - 1 pc.
- Water dispenser, dosage - 450 liters (powder coating):
- Strain gauges - 3 pcs.
- Unloading disc pneumatic valve ∅80 - 1 pc.
- Water dump pump
- Controlled water and chemical supply system
- Chemical additives dispenser, dosage - 60 liters, made of stainless steel:
- Strain gauges - 2 pcs.
5 447 232 ₸
- Software on your own SCADA system complete with a monoblock: accounting for the consumption of materials and equipment operation, remote access and control over the work in the local network
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Сontrol panel case protection - IP54
- Power cabinet case protection - IP54
- Control, protective and switching equipment "Omron", "Siemens"
- Set of diagrams and instruction manual
1 013 376 ₸
- Operator's cabin. Sheathed by zinc-coated painted profiled sheeting, finishing accessories, moisture protecting impregnation
- Frame protected against corrosion, 60 mm thick heat insulation
- Sound insulation, protection against rain
- One window (PVC, double glazing), insulated door with lock
- Lighting
- Slinging loops
- Weight - 180 kg
1 680 000 ₸
- Hardware for assembly RBU: metering complex overpass screw silage
- Hardware, accessories
- Wire for screw fixing
- Kit for connecting the database (pnevmotruba, sleeves, bends, RVC 51-70 clamps, duct PVC-5-C-60)
- Limit switch for the database
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints, anchor bolts, brackets)
- Kit RBU pneumatic (air tubing, pnevmotruba, fittings, hardware)
- Set of cables
- Couplings (5 titles)
- compactor
- Acid sealant TempPlus
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
22 082 592 ₸
- Twin-shaft concrete mixer MAO 2250
- Multi-channel uniform water spray system
- Replaceable wear-resistant Ni-Hard cast iron armor, strength 500 HB
- The hydraulic shutter drive system
- Connection set for pneumatic equipment
28 252 224 ₸
- Planetary concrete mixer MPC 2250
- Mixer drive - 74 kW
- Replaceable wear-resistant armor made of cast iron with a strength of 500HB
- The sector valve with rubber seal is equipped with a hydraulic drive with the possibility of manual opening
- Inspection hatches are equipped with an access security system
264 768 ₸
- The pump Calpeda MXH 202E assembled for chemical supply. additives
- Capacity - 80 liters/min
- Power - 0.33 kW
- Weight - 6.9 kg with packaging
- Machinery certificate
- Lattice on the section of the bunker 70x70 for DK-36 (DK-54) - RBU-2G-60AK-05.08.000
- Lattice on the section of the bunker 100x100 for DK-36 (DK-54) - RBU-2G-60AK-05.08.000-01
- Cement filter AIRFILL25 assembly (Turkey) in a rigid package
- Cartridges pneumatic cleaning system
- Adjusting ring
- Operational documentation
- Airfill v25 cement filter with a vibration cleaning (Türkiye)
- Adjusting ring
- Operational documentation
9 930 144 ₸
- Silo tank (V = 105 m3): cover - 4 sectors, cylindrical section - 28 sectors, large cone - 4 sectors, small cone
- Mounting frame
- Stairs
- Cover protection enclosure - 11 sectors
- Loading pipe d 102 with connection lock
- Inspection hatch (Viewing window for inspection and cleaning of the cone)
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Frame for transportation
- Hardware for the assembly of a silo
- Polyurethane sealant Soudaflex FC 40 gray 600 ml - 15 tubes
- Machinery certificate
3 204 096 ₸
- Auger assembly
- Pipe Diameter 273 mm, tube length of 12 000 mm
- Drive: gear motor. Power 15 kW
- Inspection window for cleaning and maintenance
- Operational documentation
9 092 160 ₸
- Silo bank (V=103m³)
- Mounting frame
- Stairs
- Cover protection enclosure
- Loading pipe d 102 with connection lock
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Machinery certificate
135 072 ₸
- Emergency pressure relief valve PV273 assy
- Adjusting ring
- Operational documentation
71 232 ₸
- Cement level sensor G2 1/2 220V assy in a package
- Adjusting ring
- Operational documentation
118 272 ₸
- Butterfly valve DN300
- Handle for gate control
- Operational documentation
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
The work of the concrete plant COMPACT-90 takes place in automatic mode in accordance with the single button principle. The operator needs to choose grade of concrete (M50 ... M500) and its quantity to be loaded into the mixer truck, press the “cycle start” button.
PA-3.0 SCADA-5.0 control panel with monoblock located in the operator's cabin, which can be installed in two positions when working: transport (built into the frame) or next to the concrete plant, a convenient place for work.
All components of the plant are mounted on a frame, which is installed on a flat area, No foundation or skip pit needed.
BP-2G-2250s Twin-shaft concrete mixer is mounted on an elevated structure. Discharge height - 4 m. The concrete mixer is equipped with a skip for mixture hoisting and feeding.
For storage and dispensing inert materials: DKM-54 batching complex. There are three hoppers of 18 cu m each. Total capacity is 54 cu m. . A dosing belt conveyor is installed under the bunkers, on which components are dispensed; the components are supplied from the bunkers by opening pneumatic valves. When the required dose of inerts has been collected, the conveyor is turned on and the inerts are fed into a skip, which lifts the components into the concrete mixer.
The cement is stored in a special warehouse - cement silo (not included in the basic package). Silos for cement must be selected based on a two-day performance margin. To supply cement from the silo to the cement dispenser, it is necessary to acquire the correct length screw.
Cement silos, silo piping and augers are always available at ZZBO warehouses in Zlatoust!
Using cement screw fed into the cement batcher (weighing capacity of 900 kg) in which the batching, where appropriate cement is discharged into the mixer.
Water is dosed using a 450 liter water dispenser. All components of the mixture are mixed, after obtaining the necessary homogeneity of the mixture, the pneumatic valve is opened and the mixture is unloaded into a concrete mixer truck or receiving hopper.
Chemical additives are dosed via the dispenser of chemical additives on 60 liters.
ZZBO is the official dealer of SICOMA concrete mixers in Russia and the CIS!
It is possible to supply a concrete plant with a concrete mixer from the manufacturer SICOMA.
One cycle lasts for 55-60 seconds , 1.5 cubic meters of the finished mixture are produced in one cycle.
- Capacity 90 cu m per hour
- It does not require foundation
- Twin-shaft concrete mixer for 2250 liters
- Software on our own SCADA system complete with a monoblock: accounting of material consumption and equipment operation, remote access and control over the work
- Transportation in two euro trailers or 40-foot containers
- Quick deployment and start-up - within one working day
Technical Features
- Capacity, cu m per hour 70...90
- Режим работы автомат по принципу "одна кнопка"
- Twin-shaft concrete mixer BP-2G-2250s
- Hoppers (number of x capacity, cu m) 3 x 18 = 54
- Silo capacity (optional), tons from 22
- Pneumatic equipment (Italy) CAMOZZI
- ABAC Pole Position L20P Compressor (Italy) Remeza
- Design summer
- Load of inert materials into the concrete mixer skip
- Total power, kW 95
- Sector gate, pneumatic control
- Dimensions of the basic configuration:
- Weight, kg 19500
- Height, mm 9010
- Width, mm 3,400
- Length, mm 17094

Quality
certificates

Products
in stock

Individual configuration
with prices for each item

Mobile
commissioning
available

Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2024
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call hotline in Kazakhstan
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: 010000, Kazakhstan, Akmola region,
г. Astana, prospekt Akžol, Zdanie 44, of. 32
e-mail: sales@zzbo.ru

Artem Kononovich
Director of the branch in Kazakhstan
Phone: +7 (7172) 760-141
e-mail: sales@zzbo.kz
Place your order
We will send you the price,
conditions and terms of delivery

Response within 1 hour

You will get the offer with
individual delivery and payment conditions