LENTA-106 Concrete Plant
64 915 200 ₸




Enquire conditions
and delivery time

We'll call you back within 15 minutes

Specify your requirements

Send prices and terms of delivery
22 164 576 ₸
- BP-2G-2250 Twin-shaft concrete mixer
- Pneumatic valve double
- Connection set for pneumatic equipment
- Броня сменная чешуйчатого типа. Толщина брони 16 мм. Материал: Чугун ЧХ16Н2
- Changeable blades. Material: ЧХ16Н2Т cast iron (chromic high alloy wear-resistant)
- Automatic central lubrication system
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Concrete mixer machinery certificate
6 053 376 ₸
- Ленточный конвейер 15 метров, ширина ленты 800 мм в сборе
- Drive: 15 kW gear motor
- Receiving hopper
- Mounting frame. 25 degrees inclination
- Барабан ведущий с футеровкой. ⌀ 420 мм, ширина 950 мм
- Барабан ведомый. ⌀ 400 мм, ширина 950 мм
- Chevron belt, thickness - 6 mm
- Docking lock “BARGER” (Russia)
- The roller support is grooved (paint and varnish coating). ⌀ 60 mm
- Ролики поддерживающие. ⌀ 89 мм
- Guide rollers. ⌀ 60mm
- Passport and instruction manual for the conveyor
3 915 072 ₸
- Эстакада Э10-Л Конструкция усиленная, адаптированная для выгрузки бетона на высоте 4 000 мм
- mixer platform with supporting structures
- Ladders for equipment maintenance
- Fence along the perimeter
- Staircase with handrails
- Funnel for unloading concrete with rubber guide
- Fastening construction for pipes and electric cables
- Hardware for the assembly trestle
- Coating: shotblasting, double coloration with drying chamber
- Total weight - 2243 kg
18 383 904 ₸
- Aggregate bins (3 x 20). Total volume 60 m³
- Preparation under registers installation for heating inert materials
- Sector valves, with control of pneumatic cylinders - 6 pcs.
- Pneumatic equipment - 6 electro-pneumatic distributors, a set of fittings and tubes, 6 quick exhaust valves, 1 pneumatic regulator, a filter with a pressure gauge
- Vibrator MVE3003 - 6 pcs.
- The support frame, installation without foundation
- Dispenser inert CI-9 (conveyor) with the lined drive drum. Drive power 18,5 kW
- Zink plated rollers
- S-shaped load cells for 2 tons - 4 pcs.
- CAS connecting box
- Signal amplifier - weight sensor
- Passport to complex metering and purchased products
4 729 536 ₸
- Mounting frame (powder coating). Weight - 200 kg
- Cement dispenser, dosage - 900 kg (powder coating):
- Three inlet pipes for augers (Two are covered with lids)
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc damper ∅200
- Strain gauges - 3 pcs.
- Signal amplifier - weight converter - 3 pcs.
- Pneumatic distributors - 4 pcs.
- Vibrator MVE41 - 1 pc.
- Water dispenser, dosage - 450 liters (powder coating):
- Strain gauges - 3 pcs.
- Unloading disc pneumatic valve ∅80 - 1 pc.
- Water dump pump
- Controlled water and chemical supply system
- Chemical additives dispenser, dosage - 60 liters, made of stainless steel:
- Strain gauges - 2 pcs.
5 447 232 ₸
- Software on your own SCADA system complete with a monoblock: accounting for the consumption of materials and equipment operation, remote access and control over the work in the local network
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Сontrol panel case protection - IP54
- Power cabinet case protection - IP54
- Control, protective and switching equipment "Omron", "Siemens"
- Set of diagrams and instruction manual
- Hardware for assembly RBU: metering complex overpass screw silage
- Hardware, accessories
- Wire for screw fixing
- Kit for connecting the database (pnevmotruba, sleeves, bends, RVC 51-70 clamps, duct PVC-5-C-60)
- Limit switch for the database
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints, anchor bolts, brackets)
- Kit RBU pneumatic (air tubing, pnevmotruba, fittings, hardware)
- Set of cables
- Couplings (5 titles)
- compactor
- Acid sealant TempPlus
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
24 864 672 ₸
- Twin-shaft concrete mixer MAO 3000
- Multi-channel uniform water spray system
- Replaceable wear-resistant Ni-Hard cast iron armor, strength 500 HB
- The hydraulic shutter drive system
- Connection set for pneumatic equipment
22 082 592 ₸
- Twin-shaft concrete mixer MAO 2250
- Multi-channel uniform water spray system
- Replaceable wear-resistant Ni-Hard cast iron armor, strength 500 HB
- The hydraulic shutter drive system
- Connection set for pneumatic equipment
28 252 224 ₸
- Planetary concrete mixer MPC 2250
- Mixer drive - 74 kW
- Replaceable wear-resistant armor made of cast iron with a strength of 500HB
- The sector valve with rubber seal is equipped with a hydraulic drive with the possibility of manual opening
- Inspection hatches are equipped with an access security system
23 886 912 ₸
- Bunkers of inert BI-80 (4 x 20) - 8 sections. The total volume is 80 cubic meters. meters
- Preparation under registers installation for heating inert materials
- Pneumatic equipment - 8 electric pneumatic distributors, a set of fittings and tubes, 8 quick exhaust valves, 1 pneumatic regulator, a filter with a pressure gauge
- Vibrator MVE 300/3 - 8 pcs.
- Dispenser inert CI-12 (conveyor) with the lined drive drum. Drive power 18,5 kW
- Strain gauges - 6 pcs.
- CAS connecting box
- Signal amplifier - weight sensor
- Passport to complex metering and purchased products
1 098 048 ₸
- Operator's cabin. Sheathed by zinc-coated painted profiled sheeting, finishing accessories, moisture protecting impregnation
- Frame protected against corrosion, 60 mm thick heat insulation
- Sound insulation, protection against rain
- One window (PVC, double glazing), insulated door with lock
- Lighting
- Slinging loops
- Weight - 180 kg
264 768 ₸
- The pump Calpeda MXH 202E assembled for chemical supply. additives
- Capacity - 80 liters/min
- Power - 0.33 kW
- Weight - 6.9 kg with packaging
- Machinery certificate
- Lattice on the section of the bunker 70x70 for DKM-80 (DKM-60) - DKM-80.23.000-02-T
- Lattice on the bunker section 100x100 for DKM-80 (DKM-60) - DKM-80.23.000-01-T
2 415 840 ₸
- Operator's cabin. Sheathed by zinc-coated painted profiled sheeting, finishing accessories, moisture protecting impregnation
- Frame protected against corrosion, 60 mm thick heat insulation
- Sound insulation, protection against rain
- Two viewing windows (PVC, double glazed windows), insulated door with lock
- Lighting
- Air conditioning
- Operator table
- Operator's chair
- Heater 2kW
- Slinging loops
- Weight 280 kg
- Cement filter AIRFILL25 assembly (Turkey) in a rigid package
- Cartridges pneumatic cleaning system
- Adjusting ring
- Operational documentation
- Airfill v25 cement filter with a vibration cleaning (Türkiye)
- Adjusting ring
- Operational documentation
9 930 144 ₸
- Silo tank (V = 105 m3): cover - 4 sectors, cylindrical section - 28 sectors, large cone - 4 sectors, small cone
- Mounting frame
- Stairs
- Cover protection enclosure - 11 sectors
- Loading pipe d 102 with connection lock
- Inspection hatch (Viewing window for inspection and cleaning of the cone)
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Frame for transportation
- Hardware for the assembly of a silo
- Polyurethane sealant Soudaflex FC 40 gray 600 ml - 15 tubes
- Machinery certificate
3 204 096 ₸
- Auger assembly
- Pipe Diameter 273 mm, tube length of 12 000 mm
- Drive: gear motor. Power 15 kW
- Inspection window for cleaning and maintenance
- Operational documentation
9 092 160 ₸
- Silo bank (V=103m³)
- Mounting frame
- Stairs
- Cover protection enclosure
- Loading pipe d 102 with connection lock
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Machinery certificate
135 072 ₸
- Emergency pressure relief valve PV273 assy
- Adjusting ring
- Operational documentation
71 232 ₸
- Cement level sensor G2 1/2 220V assy in a package
- Adjusting ring
- Operational documentation
118 272 ₸
- Butterfly valve DN300
- Handle for gate control
- Operational documentation
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
11 855 424 ₸
- Silo tank (V = 118 m3)
- Cylindrical section - 12 sectors, cover - 6 sectors
- Cone big - 6 sectors, middle cone - 4 sectors, small cone
- Mounting frame
- Stairs
- Cover protection enclosure - 17 sectors
- Loading pipe d 102 with connection lock
- Inspection hatch (Viewing window for inspection and cleaning of the cone)
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Frame for transportation
- Hardware for the assembly of a silo
- Polyurethane sealant Soudaflex FC 40 gray 600 ml - 14 tubes
- Machinery certificate
CBP operation mode - fully automatic on the principle of "single button".
BP-2G-2250 Twin-shaft concrete mixer is installed on the elevated structure with the discharge height - 4 m. Concrete mixing plant is equipped with a chevron belt conveyor for lifting and loading of the aggregates into the mixer.
ZZBO is the official dealer of SICOMA concrete mixers in Russia and the CIS!
It is possible to supply a concrete plant with a concrete mixer from the manufacturer SICOMA.
For storage and precise batching of the inert materials metering complex DCM-60. It is possible to supply bunkers of increased volume (up to 72 cubic meters). Inert materials are loaded and stored in bunkers, the number of bunkers is 3 x 20 cubic meters. meters, the total volume of bunkers is 60 cubic meters. meters. A dosing belt conveyor is installed under the bunkers, on which components are accurately dosed; the components are supplied from the bunkers by opening gate valves, the gates are controlled by a pneumatic system.
Upon achievement of the required batch of the inert materials, the conveyor is turned on and they are discharged into the belt conveyor's receiving hopper and after that into the mixer.
Protect inert materials from precipitation using Shelter of the strip conveyor!
The cement is stored in a special warehouse - cement silo (not included in the basic package). Silos for cement must be selected the rate of two daily stock performance. For feeding cement from a cement silo dispenser must acquire the correct length screw.
Cement silos, silo piping and augers are always in stock in Zlatoust!
Using the cement screw, it is supplied to the BD-90 dispenser block, which consists of a 900 kg cement dispenser, 450 liters and a 60-liter-liter-liter dispenser. Each dispenser is located on three high -precision tensodes and a hard frame, which increases the accuracy of dosing. The cement dispenser is equipped with the MVE 300/3 vibrator to encourage cement mating when he is sticking.
All components of the mixture are mixed, after obtaining the necessary homogeneity of the mixture, the pneumatic valve of the concrete mixer is opened and the mixture is supplied to the concrete mixer truck or receiving hopper.
Then the cycle is repeated.
One cycle lasts for about 50 seconds during which 0.8 cu m of ready-to-use concrete is produced. Plant's capacity is 80-106 cu m per hour of operation.
- Capacity: 106 cu m per hour
- Twin-shaft concrete mixer with belt conveyor
- Software on our own SCADA system complete with a monoblock: accounting of material consumption and equipment operation, remote access and control over the work
- Transportation in 2 euro trucks
- 2 year full warranty
Technical Features
- Capacity, cu m per hour 80...106
- Automatic operating mode
- BP-2G-2250 Concrete mixer
- Bunkers (number x volume m3) 3 x 20
- Silo capacity (optional), tons 160...315
- Design summer
- Load of inert materials into the concrete mixer belt conveyor
- Total power, kW 82
- Sector gate, pneumatic control
- Dimensions of the basic configuration:
- Weight, kg 17600
- Height, mm 9705
- Width, mm 3700
- Length, mm 27057

Quality
certificates

Products
in stock

Individual configuration
with prices for each item

Mobile
commissioning
available

Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2024
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call hotline in Kazakhstan
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: 010000, Kazakhstan, Akmola region,
г. Astana, prospekt Akžol, Zdanie 44, of. 32
e-mail: sales@zzbo.ru

Artem Kononovich
Director of the branch in Kazakhstan
Phone: +7 (7172) 760-141
e-mail: sales@zzbo.kz
Place your order
We will send you the price,
conditions and terms of delivery

Response within 1 hour

You will get the offer with
individual delivery and payment conditions