Concrete plant SMART-30 2.0-24 (2x12)
32 568 144 ₸
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
9 859 584 ₸
- BP-2G-750 Twin-shaft concrete mixer
- Skip (bucket) to load the mixture with the bottom-gate
- Concrete plant COMPACT-30 - photo 108
- Shutter - double sided
- Connection set for pneumatic equipment
- Armor shift flake type. Material: cast iron wear 15 mm
- Спицы усиленные (стальное литье) крепление типа "кулак"
- Changeable blades. Material: ЧХ16Н2Т cast iron (chromic high alloy wear-resistant)
- Устройство равномерного распределения воды с присоединительным диаметром 2"
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Purchased parts machinery certificates
- Concrete mixer machinery certificate
3 448 620 ₸
- Mounting Frame
- Рама под смеситель
- Направляющие скипа
- Protections
- Stairs
10 984 428 ₸
- Бункеры-инертных (2 х 12) - 2 секции. Общий объем 24 м³
- Sector valves, with control of pneumatic cylinders - 2 pcs.
- Pneumatic equipment - 2 electric pneumatic distributors, a set of fittings and tubes, 2 quick exhaust valves, 1 pneumatic regulator, a filter with a pressure gauge
- Вибратор MVE 300/3 - 2 шт.
- The support frame, installation without foundation
- Наклонный дозатор инертных (конвейер) с футерованным приводным барабаном. Мощность привода 7,5 кВт
- Тензодатчики на 2 тонны - 4 шт.
- CAS connecting box
- Signal amplifier - weight sensor
- Passport to complex metering and purchased products
3 443 328 ₸
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Touch control panel, diagonal 10 inches, wide viewing angle, TFT-screen, 65,000 colors.
- Сontrol panel case protection - IP54
- Control, protection and switching equipment "Schneider Electric", "Omron", "ABB", "Siemens"
- Manual control panel with ingress protection buttons on mimic panel
- Set of diagrams and instruction manual
3 703 224 ₸
- Mounting frame (powder coating). Weight - 150 kg
- Cement dispenser, a dosage - 300 kg (powder coating):
- Two inlet nozzles for screw conveyors (one is covered by a cap)
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc damper ∅200
- Strain gauges - 3 pcs.
- Signal amplifier - weight sensor
- Pneumatic distributors - 3 pcs.
- Vibrator MVE41 - 1 pc.
- Water dispenser for 150 liters (powder coating):
- Strain gauges - 3 pcs.
- Water and chemical agents multipoint injection system
- Water dump pump
- Signal amplifier - weight sensor
- Сhemical additives dispenser, dosage - 20 liters, made of stainless steel:
- Strain gauges - 1 pc.
- Signal amplifier - weight sensor
- Steel wire rope, for fastening screw
- Sleeve for DC
- Hardware for the RBU assembly (490 units)
- Fasteners (turnbuckles, clips, hooks)
- Acid sealant TempPlus
- Hardware for the component (500 units)
- PVC pipe for vodopodvedeniya (size 2)
- Set of cables
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints)
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
Job mobile concrete plant SMART-30 2.0-24 (2х12) occurs in a fully automatic mode using the “one button” principle.
The operator needs to select the brand of concrete (M50...M500) and its quantity to load into the concrete mixer truck, and press the cycle start button. PAM 4.0 SCADA control panel built into the side of the frame. The entire installation is assembled from modules, and is installed on a flat, dense area, without using a foundation or preparing a skip pit.
Двухвальный бетоносмеситель БП-2Г-750С installed on a support frame.
The concrete mixer is equipped with a skip for mixture hoisting and feeding.
Used for storage and dosing of inert дозирующий комплекс ДКТ-24S. Inert materials are stored in bunkers with a volume of 8 cubic meters. meters, total volume of bunkers 24 м³. A dosing belt conveyor is installed under the bunkers, on which components are dispensed; the components are supplied from the bunkers by opening pneumatic valves.
When the required dose of inerts has been collected, the conveyor is turned on and the inerts are fed into a skip, which lifts the components into the concrete mixer. The components of the concrete mixture (cement) are fed and weighed in the dosing unit BD-30.
- Performance 20 м³\ час
- No foundation or skip pit needed
- Пульт полуавтомат – по принципу «одна кнопка»
- Перевозка в 1 еврофуре или 40 футовом контейнере
- Быстрое развертывание и запуск за 1 рабочий день
Technical Features
Quality
certificates
Products
in stock
Individual configuration
with prices for each item
Mobile
пусконаладки
available
Worldwide
delivery
in trucks or containers
Call hotline in Kazakhstan
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: 010000, Kazakhstan, Akmola region,
г. Астана, проспект Акжол, здание 44, оф. 32
e-mail: sales@zzbo.ru
Artem Kononovich
Director of the branch in Kazakhstan
Phone: +7 (7172) 760-141
e-mail: sales@zzbo.kz
Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions