asphalt plants
Showing all 7 results
64 219 596 ₸
- Productivity, tons hour 20
- The number and volume of bins, the number of x m. Cube 3 x 8
- Weighing range of inert, kg 2,000
- Asphalt-shaft, l 750
- The volume of the hopper ready asphalt, tons 8
- asphalt temperature at the outlet, hail 120...170
- Length, mm 21871
171 904 151 ₸
- plant performance 80 t / h (3% moisture material)
- Supply hopper with inert materials, count and volume. 5 bins of 8 m3
- The thermal power of the burner 6500 kW
- Number screening sieves 5
- The volume of hot material hopper 12 m3
- Weight one batch 1,000 kg
- Total electric power plant 230 kW.
6 952 512 ₸
- Maximum productivity of the belt feeder, t/h Maximum productivity of the belt feeder, t/h
- A type Maximum productivity of the belt feeder, t/h
- Construction type Construction type
- Construction type 85
- Construction type3 1,500
- Construction type O from “Bulgaria" 200
- Productivity (at a flow rate in the cylindrical part of 2.5 m/s), mOProductivity (at a flow rate in the cylindrical part of 2.5 m/s), m Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m
7 579 320 ₸
- A type Скруббер "Вентури"
- Construction type 96
- Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m
- Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 30
- Supply Pump Parameters:
- Supply Pump Parameters: 4
- Supply Pump Parameters:3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Supply Pump Parameters:
28 025 844 ₸
- Filtration area, m² 430
- Supply Pump Parameters:3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Supply Pump Parameters:
- Supply Pump Parameters: 384
- Filter cloth material for sleeves Filter cloth material for sleeves
- Filter cloth material for sleeves O from “Bulgaria" Filter cloth material for sleeves
- Filter cloth material for sleeves O from “Bulgaria" Filter cloth material for sleeves
- Количество механизмов очистки, шт 3
432 660 198 ₸
- Plant productivity, t/h 160 (3% moisture content of materials)
- Feed hoppers with inert materials, quantity, volume 6 bunkers of 10m³
- Thermal power of the burner, MW 14
- Number of screen sieves, pcs 6
- Hot materials hopper volume, m³ 22
- Weight of one batch, kg 2,000
- Dryer drum drive power, m² 4 x 11
22 006 488 ₸
- Power supply 3-phase with neutral to earth, in 400
- The degree of protection against dust and moisture IP54
- Work transfer coefficient of strain gauges (RCP), mV / V 3 (2)
- The input analog signal "current loop" controller mA 4...20
- The maximum total error of measurement of weight,% 0,1
- Напряжение управления дозаторами битума, пыли, инертными и затвором смесителя, В 220
- Weight, kg 180
Автоматизированные асфальтовые заводы
When loading dosing hoppers with inert materials (crushed stone and sand), they enter the drying drum in certain proportions, where they are dried and heated to 160 ° C by means of heating from the burner. The resulting dust and exhaust gases through the air duct system enter the filter unit, where the dust is separated and the exhaust gases are filtered. The separated dust is dosed and used to produce asphalt concrete.
После прогрева инертные материалы по элеватору поступают в грохот. Грохот в свою очередь разделяет материалы по фракциям и отделяет негабаритные инертные, которые в дальнейшем утилизируются. Разделенные по фракциям горячие материалы поступают в накопительные бункера горячих инертных материалов. Каждая их фракций взвешиваются на весовом дозаторе и в определенных пропорциях (заданных исходя из рецептуры асфальтобетона) попадают в смесительный барабан.
In front of the mixing drum, mineral powder and bitumen dispensers are also installed. Mineral powder from the silo is fed into the batcher, weighed and sent to the dryer drum. In the same weigher, dust is weighed, which is filtered in the filter unit and used as it accumulates in the dust silo.
The bitumen is heated up to 150 °C in the bitumen storage, it enters the dispenser through the heated line, is weighed and pumped into the mixer. Initially, dry materials (crushed stone, sand, mineral powder) are mixed in the mixer, after bitumen is supplied, the final mixing takes place, which lasts no more than 20 seconds.
Ready asphalt comes from the mixing drum directly into the body of the truck.
Comes in different models, the selection of the necessary equipment assists the Sales Manager.