Hot water boiler KVA-2.0 Gn/LZh
11 732 757 ₸
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
Manometer electrocontact DM2010Sg, 0-0,6MPa range |
Manometer showing the TM-510R.00, 0-0,6MPa range |
Safety valve 17s28nzh DN50 / 80, pH = 0.5 MPa |
Temperature sensor type Pt100 RTD |
Crane grooved ball DN15 |
Crane grooved ball DN25 |
Ruff for cleaning fire tubes |
boiler control cabinet |
Passport and operating instructions on the boiler |
Горелка газовая Baltur TBG 260МС |
Gas fitting MM20.503 A120C-R2 |
Аксиальный компенсатор BTGA 2" |
Блок контроля герметичности VPS504.S02(опция) |
Горелка дизельная Baltur TBL 260P |
Форсунка 22,00x45 |
Горелка газовая FBR GAS P250/M CE TL MEC + R. CE-CT D2"–FS50 (2907 кВт прогрессивная) |
Горелка дизельная FGP 250/3 TL (2965 кВт) три ступени |
Burner combined gas-diesel |
Burner for fuel oil (spent fuel) |
The block container with viewing windows |
Diesel fuel tank BDT-0.6 |
Tank for diesel fuel BDT-1 |
Diesel fuel tank BDT-7 |
Tank for diesel fuel BDT-10 |
Tank for diesel fuel BDT-25 |
Heating hot water boiler KVa-2.0H / LV used as an independent thermal unit for heating coolants in open and closed circuits of heating systems, and as part of thermal systems with a closed circuit when organizing heating and hot water supply (DHW) of civil and industrial premises with a nominal pressure in the primary circuit of up to 0.6 MPa and temperature up to 105 °C. Coolants can be water, solutions based on propylene and ethylene glycol (antifreeze) with a concentration of up to 50%.
Boilers can be equipped burnersoperating on various types of fuel (diesel, gas, fuel oil, heating oil)
boiler KVa-2.0H / LV as part of a boiler room, can be supplied either on a frame or in a block box. Climatic modification UHL-1 when supplied in a block box; when supplied without a block box, climatic modification UHL-3.
KVA hot water boilers have a TR TS 016 certificate, a TR TS declaration 001, 010, 020 and voluntary certification according to the GOST R system.
The price for the thermal center is presented without a burner
- To provide hot water and heating
- Start-up time – 15 minutes
- Automatic control, high efficiency - 90%
- Convenient service
- Low fuel consumption
Technical Features
- Thermal power, MW 2
- Design pressure, MPa 0,6
- Test pressure, MPa 0,9
- Internal heating area, m2 46
- Boiler internal volume, m3 2,7
- Firebox volume, m3 2,375
- Connecting diameter of supply and return, DN, mm 150
- Connecting size of a drain branch pipe, DN, mm 32
- Thermal power of the burner, MW 2222
- Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) 1,72
- Diesel fuel consumption, kg/hour 99…200
- Methane consumption, nm3/hour 47…236
- Time to exit to mode, min 20-40
- Масса котла (без навесного оборудования), кг. 4,700
- Length, mm 3890
- Width, mm 1840
- Height, mm 2150
Quality
certificates
Products
in stock
Individual configuration
with prices for each item
Mobile
commissioning team
available
Worldwide
delivery
in trucks or containers
Call hotline in Kazakhstan
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: 010000, Kazakhstan, Akmola region,
Astana, Al-Farabi Avenue, building 44, office. 32
e-mail: sales@zzbo.ru
Artem Kononovich
Director of the branch in Kazakhstan
Phone: +7 (7172) 760-141
e-mail: sales@zzbo.kz
Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions