VK-15 water boiler room
19 863 954 ₸
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
| Water-heating stationary horizontal fire-tube boiler KVA-1.0 Gn/LZh made of steel 09G2S, with a furnace shell thickness of 8 mm, a body shell thickness of 6 mm, with mineral wool insulation and stainless steel cladding 0.5 mm thick |
| Collapsible plate heat exchanger DN50 (heat load: 0.85 Gcal/h). Stainless steel plates 0.4 mm thick |
| Boiler circuit coolant circulation pump (power - 1.5 kW) |
| External circuit coolant circulation pump (power - 1.5 kW) |
| Diaphragm expansion tank with a volume of 300 l |
| Safety valve 17s28nzh (2 pcs.) for protection against overpressure |
| A group of pressure gauges for measuring coolant excess pressure and controlling external electrical circuits |
| Thermal converter and thermometer for measuring the temperature of the coolant and flue gases |
| Shut-off and safety valves: ball valves, butterfly valves, check valve |
| Air vent for automatic removal of air from the system |
| Automation of a water-heating boiler room, built on the basis of the Termodat 11M6 microprocessor regulator, provides completely autonomous control of a double-circuit heating system and multi-level equipment protection. The regulator monitors the coolant temperature in real time and automatically controls the burner power levels (“large” and “small” flame), maintaining the set parameters in the boiler (80–95°C) and secondary circuits. The intelligent operating algorithm of the circulation pumps provides for their automatic start and delayed stop (5–8 minutes after the burner is turned off), which guarantees efficient heat removal and eliminates the risk of water boiling in the boiler. A comprehensive safety system, including conductometric level sensors and electrical contact pressure gauges, provides continuous monitoring of the system condition and instant blocking of operation in the event of any deviations in pressure or water level from the norm |
| Sandwich chimney of the DU 500 boiler, 6 m high, made of stainless steel with insulation 50 mm thick. |
| Ruff for cleaning fire tubes |
| Nameplates on the boiler and the control cabinet |
| Passport and operating manual |
| Burner gas Baltur TBG 120P |
| Gas fittings |
| Адаптер горелка/рампа (переходник) 2"Mx1"1/2F |
| Аксиальный компенсатор BTGA 1"1/4 |
| Diesel burner Baltur TBL 130P |
| Fitting kit for diesel burner |
| Горелка газовая FBR GAS P100/2 CE TL + R. CE D1"1/4-S (1163 кВт) |
| Diesel burner FBR FGP 70/2 TC |
| Block container |
| Diesel fuel tank BDT-0.6 |
| Tank for diesel fuel BDT-1 |
| Diesel fuel tank BDT-5 |
| Diesel fuel tank BDT-7 |
| Tank for diesel fuel BDT-10 |
| Tank for diesel fuel BDT-25 |
Hot water boiler room HEAT VK-15 designed to produce hot water at a temperature up to +95 °С and consumption up to 10 m3/ h. Ideal for supplying hot water to a concrete plant during the winter season, and can also be used for any other similar production purposes.
Operates in harsh climatic conditions with stable negative ambient temperatures.
The water heating installation consists of a boiler, heat exchanger, pumps, expansion tank, piping and storage tank.
Through the operation of the circulation pump of the internal circuit, water enters the boiler, then the water is heated to +100 °C and, passing through the heat exchanger, heats the second hot water circuit to +95 °C, while the pump is operating, which ensures complete heating of the water in the supply tank. When the pump is activated, heated water is supplied to the “consumer” for dosage.
At the same time, water enters the heat exchanger from the feed water supply and, after passing through it, heats up and enters the water tank.
The thermal circuit of the water heating installation ensures the preparation of hot water with a specified temperature range up to +95 °C. The heating system is double-circuit.
The water heating unit is supplied in the form of one transportable unit and its installation involves installation on a planned site according to the boiler house connection project, connection to external networks (heating mains, water supply, sewerage, gas pipeline, electricity) and installation of a chimney.
The water heating unit is used in electrified areas (optional operation in autonomous mode is possible when a diesel generator is supplied). Placement at an altitude of no more than 1200 m above sea level. The climatic design when supplied in the “block-box” configuration is U1. When delivered without a block box, climatic version UHL4.
In case of boiler shutdown, it is recommended to leave the piping system and boiler filled with water. The boiler should only be drained when the boiler is shut down for a significantly long period and/or when there is a possibility of the system defrosting.
The price for the thermal center is presented without a burner
- To provide a concrete plant with hot water
- Hot water capacity 15 tons/hour
- Low fuel consumption
- Mobile installation, completely autonomous
- Start-up time – 15 minutes
- Italian burner Baltur or F.B.R.
- Automatic control
Technical Features
- Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) 0,86
- Thermal power, MW 23 866 $
- Water temperature not higher, °C 95
- Thermal power of the burner, not less, MW 1,11
- Diesel fuel consumption, kg/hour 93
- Diesel fuel consumption, l/h 112
- Methane consumption, nm3/hour 118
- Time to reach operating mode, min 60
- Weight of the assembled boiler room without water, kg 3500
- Height (excluding chimney), mm 2,200
- Width, mm 2300
- Length, mm 7600

Quality
certificates

Products
in stock

Individual configuration
with prices for each item

Mobile
commissioning
available

Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2026
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call hotline in Kazakhstan
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: 010000, Kazakhstan, Akmola region,
г. Astana, prospekt Akžol, Zdanie 44, of. 32
e-mail: sales@zzbo.kz


Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions

















