Steam generators
Showing all 8 results
6 461 896 ₸
- Steam generators PG-500 are not subject to registration with Rostekhnazor, because operating pressure of the steam generator is less than 0.07 MPa. 500
- DF consumption (no more), kg/h (l/h) 32 (39)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 41
- Thermal power of the steam generator, MW (GCal) 0,35(0,3)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 0,39
- Operating pressure, MPa 0,05
9 660 363 ₸
- Steam generators PG-500 are not subject to registration with Rostekhnazor, because operating pressure of the steam generator is less than 0.07 MPa. 500
- DF consumption (no more), kg/h (l/h) 32 (39)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 41
- Thermal power of the steam generator, MW (GCal) 0,35(0,3)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 0,39
- Operating pressure, MPa 0,05
9 207 267 ₸
- Steam generators PG-500 are not subject to registration with Rostekhnazor, because operating pressure of the steam generator is less than 0.07 MPa. 1,000
- DF consumption (no more), kg/h (l/h) 69 (83)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 88
- Thermal power of the steam generator, MW (GCal) 0,74(0,64)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 0,83
- Operating pressure, MPa 0,05
13 903 875 ₸
- Steam production max, kg h 1,000
- DF consumption (no more), kg/h (l/h) 69 (83)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 88
- Thermal power of the steam generator, MW (GCal) 0,74(0,64)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 0,83
- Operating pressure, MPa 0,05
12 015 975 ₸
- Steam generators PG-500 are not subject to registration with Rostekhnazor, because operating pressure of the steam generator is less than 0.07 MPa. 1,500
- DF consumption (no more), kg/h (l/h) 103 (125)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 132
- Thermal power of the steam generator, MW (GCal) 1,12(0,96)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 1,24
- Operating pressure, MPa 0,05
17 608 219 ₸
- Steam production max, kg h 1,500
- DF consumption (no more), kg/h (l/h) 103 (125)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 132
- Thermal power of the steam generator, MW (GCal) 1,12(0,96)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 1,24
- Operating pressure, MPa 0,05
13 238 847 ₸
- Steam production max, kg h 2,000
- DF consumption (no more), kg/h (l/h) 138 (166)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 176
- Thermal power of the steam generator, MW (GCal) 1,49(1,28)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 1,66
- Operating pressure, MPa 0,05
18 567 191 ₸
- Steam production max, kg h 2,000
- DF consumption (no more), kg/h (l/h) 138 (166)
- Gas consumption (no more), nm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 176
- Thermal power of the steam generator, MW (GCal) 1,49(1,28)
- Diesel burner Baltur 90
- Thermal power of the burner, MW 1,66
- Operating pressure, MPa 0,05
Steam generators for concrete plants RBU
Steam generators for concrete plants with a capacity of 500 to 2000 kg of steam per hour. Can be supplied with a diesel or gas burner.
They were designed to work as part of a RBU; they can be manufactured on a frame or in an insulated block box.
Always available at the ZZBO warehouse in Zlatoust.